Date
2024 – 2028
Country
Moldova
Client
Moldova Energy Projects Implementation Unit (MEPIU)
Financing Institution
European Investment Bank (EIB) and European Bank for Reconstruction and Development (EBRD)
Consortium Partner
Wave 1: Sigma Engineering S.R.L.; CSZ Ingenieurconsult GmbH & Co. KG
Wave 2: BIM-TECH Solutions S.R.L.; CSZ Ingenieurconsult GmbH & Co. KG
m4h Key Areas
Health & Social Infrastructure
Commissioned by the Moldova Energy Projects Implementation Unit (MEPIU), the assignment forms part of the Moldova Energy Efficiency Project (MEEP), a national programme supporting energy-efficiency improvements in healthcare infrastructure across Moldova.
management4health AG supports the preparation of detailed technical designs and the provision of author supervision services for the energy-efficient rehabilitation of several major healthcare institutions. Through the project, healthcare facilities are being modernised to improve energy performance, building safety, accessibility, and operational efficiency while creating better environments for patients and healthcare personnel.
THE CHALLENGE
The existing healthcare building stock in Moldova includes numerous facilities developed several decades ago, which today face growing challenges related to their physical condition, technical systems, energy performance and increasing operational costs. These challenges affect the efficiency, safety, accessibility, and long-term sustainability of healthcare services.
To improve the performance and sustainability of the existing healthcare infrastructure, the Moldova Energy Efficiency Project supports a comprehensive programme of rehabilitation measures across selected healthcare institutions. The planned interventions focus on improving building envelopes, heating, cooling and ventilation systems, lighting infrastructure, fire safety, accessibility, energy management, and the integration of renewable energy solutions while ensuring compliance with national technical, environmental, health and safety requirements.
THE ASSIGNMENT
The scope of the assignment is to provide technical design and author supervision services for the energy-efficient rehabilitation of healthcare facilities under the Moldova Energy Efficiency Project.
The consultant supports the preparation of technical surveys, structural assessments, detailed technical designs, bills of quantities, technical specifications, cost estimates, and tender documentation required for the implementation of rehabilitation works. The assignment also includes environmental and social screening, health and safety assessments, fire-safety and evacuation concepts, accessibility assessments, and maintenance recommendations for the rehabilitated facilities.
The programme is being implemented in a phased manner, covering several healthcare institutions across Moldova through the following lots.
Wave 1
Lot 2: Republican Medical Diagnostic Centre, Institute of Physiopneumology “Chiril Draganiuc”, and National Laboratory for Tuberculosis Microbiology
Lot 3: Cardiology Institute and Cardiology Dispensary
The second assignment focuses on the technical rehabilitation of the Cardiology Institute and the Cardiology Dispensary, including the preparation of design documentation and supervision services for energy-efficiency improvements and associated infrastructure upgrades.
Wave 2
Lot 1: Emergency Medicine Institute
Lot 2: Oncological Institute
Lot 4: Republican Clinical Hospital “Timofei Moșneaga”
Common Services Across All Lots
Across all facilities, the proposed measures include the design of thermal insulation of façades, roofs and basement ceilings, replacement of windows and doors, modernisation of heating, cooling and ventilation systems, installation of LED lighting, photovoltaic systems and energy management systems, fire-safety improvements, accessibility adaptations, rehabilitation of supporting infrastructure, and other energy-efficiency measures.
In addition, the consultant provides author supervision throughout the construction phase, ensuring that rehabilitation works are implemented in accordance with approved designs, technical requirements, and applicable standards.
THE RESULTS
- Development of detailed technical designs and tender documentation for the energy-efficient rehabilitation of major healthcare facilities in Moldova.
- Preparation of bills of quantities, technical specifications, cost estimates, and construction documentation.
- Undertaking of technical surveys, structural assessments, environmental and social screening, and development of fire-safety and emergency evacuation concepts.
- Design of integrated energy-efficiency measures, including insulation, HVAC modernisation, LED lighting, photovoltaic installations, and energy management systems.
- Integration of accessibility improvements and fire-safety measures within the rehabilitation designs.
- Preparation of maintenance recommendations supporting the long-term operation of rehabilitated facilities.
- Provision of author supervision services during implementation of rehabilitation works.
- Contribution to improving the energy performance, operational efficiency, safety, accessibility, and sustainability of healthcare infrastructure across Moldova.

Emergency Medicine Institute

Institute of Physiopneumology Chiril Draganiuc

Oncological Institute

Cardiology Institute

Republican Clinical Hospital